top of page

The first step in auditorium projects often begins with the conversion of the existing structure. Especially when building a new auditorium in former school buildings, basements, or otherwise unused spaces, these spaces must first be properly cleared and demolished. At Nish Global, we handle all the technical and safety details of this process, ensuring the project starts from scratch with solid foundations.

What are we doing?

  • Demolition of old partition walls

  • Demolition of reinforced concrete or brick structures

  • Ceiling covering and flooring removal

  • Safely disabling electrical, water and mechanical lines

  • Professional evacuation and cleaning of construction waste

⚠️ Security is Our Priority:
All demolition operations are carried out in accordance with occupational health and safety regulations. We obtain engineering support to ensure the site's structural system is not damaged. When necessary, no intervention is initiated without a structural analysis.

🔍 Nish Look

Demolition and demolition are not simply "dismantling." Faulty interventions can jeopardize numerous elements, from the hall's acoustics to fire regulations. At Nish Global, we begin a hall project not just with a "new" design, but with the proper removal of existing ones. At the beginning of every project, our technical team inspects the site, plans the sections that need to be demolished with engineering approval, and executes all operations in a controlled manner. This saves our investors both time and security.

Demolition - Demolition - Renovation

$0.00Price
$0.00 per 1 Square meter
Quantity
Only customers who purchase turnkey conference hall construction services can purchase. Nish Global does not offer this service outside of turnkey conference hall construction projects.

    Nish Global Türkiye - Egypt - M.E.N.A. - Eurasia

    bottom of page